Work required

Work required

SPM documentation - April 30th 2010 Written by Rémi Equoy

Introduction

The Work required is listed and selected into the Repair and the Exchange documents :


The Work required can be one of the following value :

Work required

Default returned and expected condition

  • Repair
  • RP
  • Overhaul
  • OH
  • Test + re-certification
  • SV
  • Calibration
  • SV
  • Inspection
  • SV
  • Repair + modification
  • OH


See also - Repair - Exchange -


                       

Created with the Freeware Edition of HelpNDoc: Free help authoring environment